Rubber base, stair treads & transitions · Denver metro

The edges that finish a building.

Rubber and vinyl wall base, rubber stair treads and risers, nosings and transitions for multifamily corridors, stairs, amenities and back of house.

What we install

Scope we carry.

  • Rubber & vinyl wall baseCove and straight base, scribed to the floor and the wall; coils for long corridor runs.
  • Rubber stair treads & risersTreads, risers and integrated nosings for common and egress stairs.
  • Stair nosingsHard-surface stairs counted one nosing per riser, including the top landing.
  • Transitions & trimsReducers, thresholds and metal profiles where floors change material or height.
  • VCT & sheet vinylBack-of-house resilient, with self-leveling underlayment where the floor needs it.
Our rules

Done the same way, every floor.

  1. 01 · Base
    Never over wall tileRubber base is not set over wall tile. Tiled walls get a tile base or a trim instead.
  2. 02 · Stairs
    Uniform nosing projectionNosing projection held between 3/4" and 1-1/4", uniform within 3/8" across a flight.
  3. 03 · Lots
    One run per buildingResilient is bought on one production run and checked at receiving, because installation counts as acceptance.
  4. 04 · Closeout
    Attic stock from the same runSet aside at receiving and handed over with a signed transmittal.
FAQ

Questions we get asked.

Do you install rubber base as a separate scope?

Yes. Rubber and vinyl base, stair treads and transitions can be bid on their own or as part of a full multifamily flooring package.

How are stair nosings counted?

One nosing per riser on hard-surface stairs, including the top landing nosing. Carpeted stairs get nosing only when it is specified.

Can rubber base go over wall tile?

We don't install rubber base over wall tile. Where walls are tiled, the bid carries a tile base or a trim instead, and it is written on the proposal.

How do you keep base and treads the same color across a building?

The building or phase is bought on one production run, recorded at receiving, and attic stock is set aside from that same run.

Start a project

Send us
the drawings.

An invitation to bid or a plan-room link. We read the scope and reply with next steps.